UPDATED 2026 GENERAL CONTRACTOR LICENSING GUIDE

Tennessee General Contractor License Requirements: The $25,000 Threshold, Monetary Limits & the New Surety Bond Option (2026)

Table of Contents

Download the Checklist!

By clicking 'Access Checklist' you agree to our Terms of Service (including the mandatory arbitration provision) and you acknowledge you have read our Privacy Policy. You also consent to receive marketing calls or SMS messages relating to our business, including by automated dialer, pre-recorded voice, or AI-generated voice technology, to the number you provide, for marketing purposes. Consent to receive such communications is not a condition to using our services, and if you choose not to consent, you may join by calling 858-842-5746.

If you’re planning to run a general contractor business in Tennessee, you need a state license before you bid, not before you build. The Tennessee Board for Licensing Contractors requires a license before contracting, and contracting includes bidding, offering to engage, or negotiating a price on any project of $25,000 or more. Getting the license means passing a Business and Law exam plus a trade exam, submitting a CPA-reviewed or audited financial statement, and paying a $250 application fee. That financial statement does something most states don’t do: it sets a monetary limit, a hard dollar cap on the size of any single project you may take. As of July 1, 2026 you can post a surety bond instead of the financial statement, and exams moved from PSI to Prov on the same date. This page covers the threshold, the limits, the exams, the residential shortcut, the nine-county home improvement license, and what happens if you get it wrong.

Licensing rules vary a lot from one state to the next. Some hand the job to local governments entirely, while others run one central program that every contractor answers to. The demand behind those rules is steady either way. Bureau of Labor Statistics figures from the Occupational Employment and Wage Statistics survey for May 2025 count about 380,360 construction managers, 812,210 first-line supervisors of construction trades, 146,720 construction and building inspectors, and roughly 1,096,780 construction laborers working nationwide. Construction manager jobs are on track to rise 9% between 2024 and 2034, well ahead of the pace for the average occupation.

Tennessee is a big, busy construction market with a wide gap between the bottom and the top. BLS state figures (Tennessee OEWS, May 2025) count 5,860 construction managers earning a mean of $58.78 an hour, or $122,250 a year, with a median of $110,200. There are 17,770 first-line supervisors of construction trades and extraction workers at a $76,830 mean, 26,250 construction laborers at $45,970, and 2,500 construction and building inspectors at $61,410. Concentration tells the real story: laborers run at a location quotient of 1.14 and supervisors at 1.04, both above the national rate, while construction managers sit at 0.73. Tennessee employs a lot of crews and proportionally fewer salaried managers, which is exactly what a market full of owner-operated firms looks like.

Quick answer: do you need a general contractor license in Tennessee?

Yes, and the timing catches people out. You need the license before you bid, not before you break ground.

A contractor’s license from the Tennessee Board for Licensing Contractors (TBLC) is required before contracting, and the Board defines contracting to include bidding, offering to engage, or negotiating a price. The trigger is a project of $25,000 or more, counting materials, equipment, and labor, when you act as a prime contractor, as certain subcontractors, or as a construction manager or consultant.

Three separate thresholds run alongside it:

  • Electrical, mechanical, plumbing, HVAC, and roofing subcontractors need a license when contracting directly with a contractor rather than the owner, and their portion of the project is $25,000 or more.
  • Masonry subcontractors need a license when the masonry portion reaches $100,000 or more.
  • Residential remodeling from $3,000 to $24,999 needs a Home Improvement license, but only in the nine counties that adopted the law.

Getting licensed involves the Tennessee Business and Law exam, a trade exam for most classifications, a reviewed or audited financial statement, a letter of reference, proof of insurance, a notarized affidavit, and a $250 application fee. Your license then carries a monetary limit set by your financials, capping the value of any single project you may take on.

Key takeaways

Everything you need to know about getting licensed as a contractor in Tennessee:

The license comes before the bid: Contracting includes bidding, offering to engage, or negotiating a price. Quoting a $25,000 job without a license is already a violation.

$25,000 is the main threshold: That counts materials, equipment, and labor, and it applies to primes, construction managers, and consultants alike.

Your financials cap your project size: The monetary limit is 10 times the lesser of working capital or net worth. Unlimited requires $300,000 in both.

A surety bond is now an option: Since July 1, 2026 a bond worth at least 50% of your requested limit can replace the CPA financial statement.

A residential shortcut exists: The BC-A/r route swaps both exams for a community college course, but caps you at $125,000 with no tolerance.

Exceeding your limit is as bad as no license: A contractor in violation can recover only actual documented expenses, proven by clear and convincing evidence.

The $25,000 rule and who it actually catches

Most states measure the license threshold against the work. Tennessee measures it against the conversation.

The statute makes a license a prerequisite to contracting, and the Board spells out that contracting includes bidding, offering to engage, and negotiating a price. So the violation happens when you hand over a $40,000 quote, not when you pour the footings. That distinction matters for anyone planning to get licensed while a first big job is pending.

The $25,000 figure includes materials, equipment, and labor, and it applies per project or contract. You may not split a project into phases to slide under the number, and the Board says so directly.

RoleLicense required when
Prime contractor, bids or contracts with the ownerProject is $25,000 or more
Construction manager or consultantTotal project value is $25,000 or more
Electrical subcontractor to a contractorThat portion is $25,000 or more
Mechanical or HVAC subcontractorThat portion is $25,000 or more
Plumbing subcontractorThat portion is $25,000 or more
Roofing subcontractorThat portion is $25,000 or more
Masonry subcontractorThat portion is $100,000 or more
Residential remodeler, adopting countiesJob is $3,000 to $24,999
Sub to a sub, multiple subs on the projectGenerally yes, verify with the Board

Roofing gets its own statutory line. No contractor is authorized to perform roofing work where the roofing portion is $25,000 or more unless licensed, with a narrow exception for licensed manufactured home installers and retailers.

Three credentials, not one

Tennessee runs several programs out of the same board, and picking the wrong one wastes months.

CredentialScopeKey requirement
Contractor licenseProjects $25,000 and upExams plus financial statement or bond
Home Improvement licenseResidential $3,000 to $24,999$10,000 surety bond, nine counties only
Limited Licensed ElectricianElectrical under $25,000Separate program, no exam waivers
Limited Licensed PlumberPlumbing under $25,000Separate program, no exam waivers

The trade exam waiver agreements Tennessee holds with other states apply only to the Contractor program. They do not apply to Home Improvement, LLE, or LLP.

Monetary limits: how your balance sheet caps your project size

This is the part of Tennessee licensing that surprises contractors from states where a license is a license.

Every Tennessee contractor license carries a monetary limit: the total dollar amount allowed for each individual project or contract. There is no cap on how many projects you run, only on how big each one can be.

The formula is arithmetic, not judgment. The monetary limit is 10 times the lesser of your working capital or your net worth, plus the required experience. Working capital is current assets minus current liabilities. Net worth is total assets minus total liabilities. Because the Board uses the lesser of the two, a strong number on one side does not rescue a weak number on the other.

If you want a limit ofYou need working capital ofAnd net worth of
$150,000$15,000$15,000
$500,000$50,000$50,000
$1,000,000$100,000$100,000
$3,000,000$300,000$300,000
Unlimited$300,000$300,000

The Board’s own example makes the trap concrete: with working capital of $10,000 and net worth of $200,000, your monetary limit is $100,000, not $2,000,000.

There is a 10% tolerance on the monetary limit, so a $500,000 limit stretches to $550,000 in practice. The one exception is the Restricted Residential Limited License, which gets no tolerance at all.

Which kind of financial statement you need depends on the limit you want. A reviewed statement covers limits of $3,000,000 or less. An audited statement is required above that. The Board’s own Increase Monetary Limit guidance makes this explicit with worked examples: moving from $750,000 to $1,500,000, or from $1,000,000 to $3,000,000, both require only a reviewed statement plus experience.

Worth stating plainly, because a $1,500,000 audit threshold circulates widely in contractor guides. It is not the initial licensure threshold. That figure belongs to renewal-stage documentation, where requirements are lighter, so check the Board’s current Renewal Instruction Booklet rather than assuming.

The statement must come from a licensed CPA or LPA on a GAAP basis, dated within 12 months, in the exact name and mode of operation being licensed. If you are licensed as John Doe Construction Company LLC, the statement carries that exact name. Income-tax-basis and compiled statements are not accepted.

Two supplements can help a thin statement, and they are valued differently. A Line of Credit on the Board’s format from an FDIC-approved institution supplements working capital only, counted at full value, though it drops to 50% value if your working capital or net worth is negative. A Guaranty Agreement with a personal or parent financial statement can supplement both working capital and net worth, but only at 50% value. The lowest Contractor’s License Bond the Board accepts in place of a guaranty is $500,000. The Board requires an indemnity from the owners when a statement shows a deficiency, including cash-only statements with little or no fixed assets, or statements where receivables make up most of the working capital. Indemnities expire at renewal and cannot run beyond two years. A bond in the Board’s format can replace a Guaranty Agreement at $500,000, or $1,000,000 for unlimited limits.

Guaranty agreements and the deficient financial statement

The Board reads the composition of your statement, not just the bottom line, and two patterns trigger an extra requirement.

An indemnity, meaning a Guaranty Agreement or a bond, is required from the owners when the statement shows a deficiency. The Board names two: cash-only statements with little or no fixed assets, which Rule 0680-1-.13 treats as deficient in plant and equipment, and statements where receivables make up most of the working capital. For receivables you have an out: submit an updated statement showing they were collected.

Who guarantees depends on your structure. A personal guarantor submits a Guaranty Agreement with a personal financial statement from the owners, which can be self-prepared. A parent company guarantor submits a parent statement, unreviewed unless the subsidiary provided none.

A bond in the Board’s format can replace a Guaranty Agreement at $500,000, or $1,000,000 for unlimited limits. That is a different instrument from the new Contractors’ Surety Bond that replaces the financial statement outright.

All indemnities expire at renewal and cannot run beyond two years, so a guaranty is a bridge, not a fix.

The surety bond option that started July 1, 2026

This is new, and it changes the math for contractors who have the skill but not the balance sheet.

Beginning July 1, 2026, contractors may use a Contractors’ Surety Bond as an alternative to submitting a CPA-reviewed or audited financial statement. The bond must be in an amount equal to at least 50% of the monetary limit requested, and applicants must use the Board-approved bond form.

Run the comparison for a $500,000 limit. The financial statement route asks for $50,000 in both working capital and net worth, plus a CPA engagement. The bond route asks for a $250,000 bond, which in practice means a premium rather than $250,000 in cash, and no CPA review.

Whether that trade is worth it depends on your credit and your accounting. A newer company with good credit and a lean balance sheet may find bonding cheaper and faster. An established firm with real working capital will usually stay with the statement. Most guides written before mid-2026 do not mention this option at all.

Classifications and the 60% rule

Your license carries a classification describing what you may build, drawn from Board Rule 0680-1-.16 and compiled in the Board’s Classification Outline. The main building classifications are BC for residential, commercial, and industrial, BC-A for residential, BC-B for commercial, and BC-C for industrial, with mechanical and electrical classifications alongside them.

Two rules govern how classifications work on a real project. Your classification generally must cover 60% of the total project in order to bid it. If you hold a commercial classification you may bid a broader project, but you must subcontract the portions over $25,000 to properly licensed contractors.

Residential building contractors are those limited to one to four family residences not exceeding three stories. BC-A contractors may bid any of the 34 building categories for residential projects.

Construction managers, consultants, and joint ventures

Tennessee reaches further down the contracting chain than most states, and three situations deserve naming.

Construction managers and consultants need a license. If total project value is $25,000 or more, a construction manager or consultant must hold a contractor’s license. That surprises firms that advise on projects without carrying subcontracts, and it applies whether or not you touch the work.

A sub to a sub can need a license. Where more than one subcontractor sits in the chain, the lower-tier sub can fall inside the requirement. Worth a call to the Board on layered projects.

Joint ventures are allowed, with one exception. The BC-A/r restricted residential license does not permit them at all.

The theme is that Tennessee attaches licensure to the role you play, not the tools you carry. If you are directing, advising, or pricing construction at or above the threshold, assume the Board wants a license.

Exams: Business and Law plus a trade exam

Every contractor applicant takes the Tennessee Business and Law exam. Most classifications also require a trade exam. Exams are open-book and are generally valid for two years.

The provider changed recently. Prov took over exam administration from PSI on July 1, 2026. Applicants already scheduled with PSI for a date after July 1 could keep the appointment, with PSI continuing through September, but new scheduling goes through Prov.

Trade examCovers
BC-AResidential
BC-BCommercial
BC-CIndustrial
BCResidential, commercial, and industrial
BC-A,b(sm)Residential and small commercial under $750,000
BC-B,CCommercial and industrial
CEElectrical
CMCFull mechanical, plumbing and HVAC, pre-approval
CMC-APlumbing, pre-approval required
CMC-CHVAC
CMC-DFire sprinkler
LMCLicensed masonry, projects $100,000 or more

Pre-approval by the Board is required before you can sit the plumbing CMC-A or the full mechanical CMC exam. You request it by emailing a completed Pre-Approval Request Form to the Board, and there is a $50 fee.

The exam structure has a useful flexibility built in. The same person does not have to take both the Business and Law exam and the trade exam, and up to two people may take each exam on behalf of the company. The Qualifying Agent is the person designated to test for the entity, and must be an owner, a full-time employee, or an officer. A qualifying agent without ownership completes a Power of Attorney form.

Exam prep courses must come from a Board-licensed provider if you want one, and the Board publishes the licensed list.

The BC-A/r route for smaller residential work

Tennessee offers a genuine shortcut for residential contractors who do not want to sit exams.

Instead of taking the BC-A Residential Trade Exam and the Business and Law exam, you may complete a Limited License course through a Tennessee community college or vocational school. The Board waives only the examination requirement, so every other application item still applies.

The trade-offs are real:

  • Work must cost less than $125,000, based on your financial statement
  • Scope is limited to single family dwellings, so no commercial work
  • The contract or permit value includes your cost of land and your profit
  • There is no 10% monetary tolerance, unlike every other license
  • Joint ventures are not permitted under this license

To go above $125,000 and remove the restriction, you take the required exams and submit a reviewed financial statement. For a contractor whose whole business is single-family remodels and additions under six figures, the course route is faster and cheaper. For anyone planning to grow past it, the exams are the better investment up front.

Reciprocity and trade exam waivers

You cannot operate in Tennessee on another state’s license. Full stop. What Tennessee offers instead is a waiver of the trade exam for contractors actively licensed in certain states.

StateWaiver covers
AlabamaGeneral, Electrical, Residential, HVAC
ArkansasCommercial and residential building only
LouisianaResidential, Commercial, Electrical, Mechanical
MississippiResidential, Commercial, Electrical, Mechanical
North CarolinaResidential and commercial building, Electrical
OhioElectrical, Plumbing, HVAC
South CarolinaCommercial building, electrical, HVAC, plumbing
West VirginiaResidential, commercial, industrial, and more

Tennessee also accepts the NASCLA National Commercial exam. To claim a waiver, have the participating state complete the Board’s License Verification form and return it with your application. The Business and Law exam is never waived.

Applying to the Board, step by step

Board approval happens at scheduled meetings, so build a few weeks into your plan.

Step 1: Pick your classification and monetary limit

Read the Board’s Classification Outline and choose classifications covering the work you actually bid. Then decide the monetary limit you need, because that determines what financial documentation you must produce.

Step 2: Register the entity with the Secretary of State

Tennessee corporations submit a charter and proof of registration. Out-of-state corporations register as a foreign corporation and submit a Certificate of Authority. LLCs submit Articles of Organization. If you use a DBA, the full DBA name must appear on your Secretary of State certificate and every other form.

Step 3: Designate your qualifying agent and pass the exams

Your QA must be an owner, full-time employee, or officer. Schedule the Business and Law exam and any required trade exam through Prov. Request pre-approval first if you need the CMC or CMC-A exam.

Step 4: Choose the financial statement or the bond

Engage a CPA or LPA for a reviewed statement up to a $3,000,000 limit, or an audited statement above it. Or use the Contractors’ Surety Bond at 50% of your requested limit on the Board’s form.

Step 5: Get your letter of reference

A past client, a former employer, or a code official who has inspected your work can write it. It does not have to be a Tennessee resident, and it cannot be a family member.

Step 6: Line up insurance and settle your workers’ comp position

General liability is required, scaled to your monetary limit, so the coverage you need rises as your limit does. The Board publishes an Insurance Resources document with the current figures, and it is worth checking those before you bind coverage.

Workers’ compensation needs its own decision, covered in the next section.

Step 7: Complete and notarize the Contractor’s Affidavit

It must be signed and notarized by the qualifying agent, owners, partners, members, main officers, and major stockholders. Every block gets checked, with explanations attached where required.

Step 8: Apply online and pay $250

Submit the Initial New Contractor Application at core.tn.gov with the $250 fee. The Board publishes a step-by-step visual guide for the application if you want to see each screen before you start.

Workers’ compensation and the exemption registry

Tennessee treats construction differently from other industries, and getting this wrong can stall your application.

The trigger is one employee, not five. Most Tennessee employers fall under workers’ compensation law at five employees. Construction employers, called construction services providers, must carry coverage at one or more employees, including seasonal, part-time, family, and as-needed workers. T.C.A. § 50-6-902(d) applies the requirement whether or not you employ fewer than five people.

Owners must cover themselves or register. Since March 2011, contractors have had to show coverage on themselves as well as their employees unless exempt. Up to three owners, officers, partners, or members may exempt themselves through the Workers’ Compensation Exemption Registry under T.C.A. Title 50, Chapter 6, Part 9. It is administered by the Bureau of Workers’ Compensation, though older guidance still points to the Secretary of State. Approval is reviewed, not automatic, and the registry is publicly searchable.

The Board accepts three answers. Anyone applying for or renewing a Contractor or Home Improvement license must supply proof of workers’ compensation, or proof of registration as a construction services provider, or a completed exemption questionnaire from the application. A narrow example of a genuine exemption: a sole proprietor or partnership with no subcontractors and no employees, working directly for a residential property owner.

Exemption is not protection. Under T.C.A. § 50-6-910, a worker injured while employed by an exempt provider sues at common law instead of through the Workers’ Compensation Act. Skipping the premium costs you the liability shield.

Out-of-state contractors, read this twice. Providers from other states must maintain a Tennessee workers’ compensation policy with “Tennessee” listed in section 3A from the first day of operation here. A home-state policy without Tennessee named is not compliance.

When the Board wants to interview you

An interview at a regularly scheduled Board meeting may be required for applicants who submit an incomplete application. It becomes effectively mandatory in three situations the Board names: complaints, convictions, or previously bidding work where a license was required.

That third trigger is the one to plan around. Contractors who quoted a $30,000 job before licensing sometimes disclose it on the affidavit and are then surprised to be summoned. Disclosing is still right, since the affidavit is notarized and requires explanations where applicable.

The interview is informal, usually under 30 minutes, and you are generally interviewed by a Board member from your field. Wait times can exceed an hour because of meeting scheduling. Since approvals happen at scheduled meetings rather than on a rolling basis, an interview can add weeks to your timeline.

Home improvement license: the nine-county rule

Tennessee’s Home Improvement license fills the gap below $25,000, but only where local government asked for it.

The license is required for residential remodeling from $3,000 to $24,999, and only in the counties that adopted the law: Bradley, Davidson, Hamilton, Haywood, Knox, Marion, Robertson, Rutherford, and Shelby. That list covers Nashville, Memphis, Chattanooga, and Knoxville, so most of Tennessee’s remodeling volume sits inside it.

Home improvement is defined broadly at T.C.A. 62-6-501(4)(A) and includes repair, replacement, remodeling, alterations, or additions to land or a residential building. Driveways, swimming pools, porches, garages, landscaping, fences, roofing, and painting all count.

Home Improvement requirementDetail
Project range$3,000 to $24,999
CountiesNine adopting counties only
Surety bond$10,000, or cash or property bond, or letter of credit
IdentityPhoto ID and Social Security number
InsuranceGeneral liability and workers’ compensation
EntitySecretary of State registration if incorporated or LLC
ExperienceRemodeling experience required
Application fee$250
ExamNone
Trade exam waiversNot available for this program

No exam and no CPA financial statement makes this a much lighter lift than the contractor license. The bond is the main cost.

Penalties: losing your right to get paid

Tennessee’s civil penalties are modest. The consequence that actually ends businesses is in the damages rules.

You can recover only documented expenses. Under T.C.A. § 62-6-103(b), any contractor required to be licensed who is in violation of the chapter or the Board’s rules cannot recover damages in any court beyond actual documented expenses, proven by clear and convincing proof. No profit, no overhead, no lost opportunity.

That applies even if you hold a license. The 2009 amendment extended the rule from unlicensed contractors to any contractor “required to be licensed” who is in violation. Tennessee courts have applied it to a licensed contractor who signed a contract exceeding his monetary limit. Bidding a $572,000 house on a $350,000 limit put that contractor into the documented-expenses-only category.

No mechanic’s lien. T.C.A. § 62-6-103(c) removes lien remedies from anyone engaged in construction in violation of the chapter.

Citations and civil penalties. The Board’s Executive Director may issue citations against people contracting without a license, with civil penalties from $50 to $1,000 per Rule 0680-01-.21. The Board’s broader penalty schedule under Rule 0680-01-.19 runs $50 to $1,000 for most violations, rising to a range topping out at $5,000 for offering to engage above your monetary limit and certain financial and advertising rule violations.

Offering above your limit is its own violation. T.C.A. § 62-6-120 prohibits offering to engage above your limit before an increase is approved. Not signing above it. Offering.

In Tennessee, the monetary limit is the line between a collectible contract and an uncollectible one.

Renewal, retirement, and raising your limit

Licenses run on a two-year cycle, and each renewal brings the financial documentation back around. Exams are generally valid for two years as well.

Raising your monetary limit requires a current reviewed or audited GAAP statement from an actively licensed CPA, dated within 12 months, plus experience or a resume. Compiled and income-tax-basis statements are rejected. Requests of $3,000,000 or less need only a review. Increases need Board approval at a scheduled meeting, and you cannot offer work above the new number until it lands.

Retiring a license is the option most contractors do not know about. The Board allows a license to be retired for $25 per year, up to seven years, with no financial statement and no proof of insurance required during retirement. You reactivate by completing a license renewal. For a contractor stepping back for a few seasons, that beats letting a license lapse and starting over with exams.

Local business tax licenses and permits

The state license authorizes you to contract. It does not cover local obligations.

Tennessee requires a business tax license through the Department of Revenue, and you must hold one for each city or county where you plan to operate. The Board itself flags this in its application instructions, alongside getting an EIN from the IRS.

Building permits come from the local codes department. Permit clerks verify state license status and monetary limit at intake, which is another reason the limit matters at the counter and not just in your file.

Nine mistakes that cost Tennessee contractors money

Bidding before licensing. Contracting includes bidding and negotiating a price. The violation predates the shovel.

Signing above the monetary limit. Even a licensed contractor who exceeds the limit can be held to documented expenses only.

Assuming the 10% tolerance always applies. It does not apply to the BC-A/r restricted residential license.

Submitting a compiled financial statement. Compiled and income-tax-basis statements are rejected. Reviewed or audited only.

Using a stale statement. The balance sheet must be under 12 months old at submission, in the exact licensed name including any DBA.

Choosing a family member as your reference. The letter of reference cannot come from a family member.

Expecting reciprocity. No other state’s license lets you work in Tennessee. Waivers cover the trade exam only.

Forgetting local business tax licenses. You need one for every city and county where you operate.

What general contractors earn in Tennessee

Tennessee has the widest pay spread of any state in this series, and the licensing system is part of the reason.

Tennessee, May 2025EmploymentMean hourlyMean annualMedian annual10th percentile90th percentile
Construction managers5,860$58.78$122,250$110,200$65,780$183,270
First-line supervisors, construction trades17,770$36.94$76,830$74,470$49,000$108,320
Construction and building inspectors2,500$29.53$61,410$59,870$38,670$84,600
Construction laborers26,250$22.10$45,970$45,000$34,910$59,990
Source: U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics, Tennessee, May 2025.

Construction managers here run from $65,780 at the 10th percentile to $183,270 at the 90th, a spread of roughly $117,000. Compare that to South Dakota, where the same occupation spans about $71,000. Tennessee rewards scale heavily, and scale in this state is gated by your monetary limit. A contractor stuck at a $125,000 restricted residential license and a contractor holding an unlimited license are doing recognizably different jobs for recognizably different money, and the difference between them is a financial statement. For how these figures compare across states, see our contractor and construction manager salary breakdown.

Keep your bids inside your limit without doing math twice

Tennessee ties your income to a number on a piece of paper. Your monetary limit caps every contract, the 10% tolerance is the only cushion you get, and going over it can turn a signed job into a claim for documented expenses. That makes accurate, current job values less of a bookkeeping nicety and more of a legal safeguard.

Housecall Pro’s general contractor software keeps job details, pricing, and customer records in one place, so the value you quote is the value on record from bid through final payment. Build quotes with cost breakdowns and margin visible before you send them with Estimates, collect a signature on the spot, then bill larger projects in stages with Invoicing while automated reminders handle the follow-up. Clean books also make renewal season and monetary limit increases easier, since the Board wants a CPA statement dated within 12 months and your accountant can only work with the records you kept. Running longer builds? Look at construction management software for remodelers or the general contractor resource hub for free templates. Smaller residential work fits handyman software. Try Housecall Pro free for 14 days.


General information, not legal advice. Fees, thresholds, and limits change. Verify with the Tennessee Board for Licensing Contractors, the TN Department of Revenue, and your local codes department, and consult an attorney about your contracts.

Tennessee contractor license FAQs

Do I need a general contractor license in Tennessee?

Yes, for projects of $25,000 or more including materials, equipment, and labor. The license must be in hand before you bid, offer to engage, or negotiate a price, not just before you start work.

How much does a Tennessee contractor license cost?

The initial application fee is $250, the same as the Home Improvement license. Beyond that you pay exam fees through Prov, a CPA for the financial statement or a surety premium for the bond, and $50 if you need CMC or CMC-A pre-approval.

What is a monetary limit in Tennessee?

The maximum dollar value of any single project or contract you may take. It is calculated as 10 times the lesser of your working capital or net worth, with a 10% tolerance on most licenses.

How do I get an unlimited license in Tennessee?

Show $300,000 in both working capital and net worth, plus the required experience, on an audited financial statement. Audited statements are required for any limit above $3,000,000.

Can I use a surety bond instead of a financial statement?

Yes, since July 1, 2026. The bond must equal at least 50% of the monetary limit requested, on the Board-approved form.

What exams does Tennessee require?

The Tennessee Business and Law exam for every applicant, plus a trade exam for most classifications. Both are open-book and generally valid for two years. Prov replaced PSI as the provider on July 1, 2026.

Can I skip the exams as a residential contractor?

Partly. The BC-A/r restricted license lets you complete a community college Limited License course instead of the trade and Business and Law exams, but caps work at $125,000 with no tolerance and no joint ventures.

Does Tennessee have reciprocity with other states?

No. You cannot work in Tennessee on another state’s license. Tennessee does offer trade exam waivers for contractors actively licensed in Alabama, Arkansas, Louisiana, Mississippi, North Carolina, Ohio, South Carolina, and West Virginia, and it accepts the NASCLA commercial exam.

Do subcontractors need a license in Tennessee?

Electrical, mechanical, plumbing, HVAC, and roofing subs need one when contracting with a contractor rather than the owner and their portion hits $25,000. Masonry subs at $100,000.

What is the Tennessee Home Improvement license?

A lighter credential for residential remodeling from $3,000 to $24,999, required only in Bradley, Davidson, Hamilton, Haywood, Knox, Marion, Robertson, Rutherford, and Shelby counties. It needs a $10,000 bond and no exam.

What happens if I work without a license in Tennessee?

A contractor in violation can recover only actual documented expenses in court, proven by clear and convincing evidence, and loses mechanic’s lien remedies. Citations carry civil penalties from $50 to $1,000.

What if I go over my monetary limit?

The same damages restriction applies. Tennessee courts have limited a licensed contractor to documented expenses after he signed above his limit.

Do I need workers' compensation in Tennessee?

Construction employers need coverage at one employee, not five, and that includes part-time, seasonal, and family workers. Owners must cover themselves or register up to three owners on the Workers’ Compensation Exemption Registry. Out-of-state contractors need a Tennessee policy naming Tennessee in section 3A from day one.

Do I need a local business license too?

Yes. Tennessee requires a business tax license through the Department of Revenue for each city or county where you operate, separate from the state contractor license.

How much do general contractors earn in Tennessee?

Construction managers average $122,250 a year with a median of $110,200, according to BLS data for May 2025. The bottom 10% earn $65,780 and the top 10% earn $183,270. First-line supervisors of construction trades average $76,830.

TOLL FREE: 858-842-5746

Download the Checklist!

By clicking 'Access Checklist' you agree to our Terms of Service (including the mandatory arbitration provision) and you acknowledge you have read our Privacy Policy. You also consent to receive marketing calls or SMS messages relating to our business, including by automated dialer, pre-recorded voice, or AI-generated voice technology, to the number you provide, for marketing purposes. Consent to receive such communications is not a condition to using our services, and if you choose not to consent, you may join by calling 858-842-5746.

Get $50 gift card

Talk to an expert and see how Housecall Pro can fit your needs.

Prefer to explore on your own?

Book a Free Demo
Are you a Sherwin Williams Pro?
How did you hear about us?

By clicking 'Book a demo' you agree to our Terms of Service (including the mandatory arbitration provision) and you acknowledge you have read our Privacy Policy. You also consent to receive marketing calls or SMS messages relating to our business, including by automated dialer, pre-recorded voice, or AI-generated voice technology, to the number you provide, for marketing purposes. Consent to receive such communications is not a condition to using our services, and if you choose not to consent, you may join by calling 858-842-5746.