Plumbing Bid Calculator
Estimate every project accurately with our free and easy-to-use calculator.
Plumbing Resources
More free tools for your plumbing business
Check out our complete library of free templates and resources for your plumbing business.
What is an plumbing bid calculator?
An plumbing bid calculator helps techs and contractors estimate the overall cost of an plumbing project down to the dollar. It decreases the possibility of human error (no offense) and can save you a ton of time. The calculator creates a detailed cost estimate by letting users enter a variety of information, like labor rates, projected labor hours, material costs, equipment charges, travel costs, and permission fees. Plumbing bid calculators can be customized to fit the specific requirements of all kinds of projects, making them essential for presenting competitive and realistic bids.
How do I determine the labor rate for my project?
The labor rate is the hourly wage you pay your techs, including additional benefits, taxes, and overhead costs. It can also include a profit margin. Research local industry standards to set a competitive rate.
What should I include in the material costs input?
Material costs are all the supplies and components needed for the project. Think wires, outlets, switches, circuit breakers, tools, and other plumbing materials. Be sure to include taxes, shipping fees, and any discounts received.
How do I calculate the markup percentage?
The markup percentage is calculated based on your company’s overhead costs and desired profit margin. Overhead may include administrative expenses, insurance, and utilities. A common markup range is 10% to 20%, but this can vary based on your specific business needs.
Can I use the calculator for different types of HVAC projects?
Yes. The calculator can be used for all kinds of HVAC projects from a small home install to a massive industrial complex. Simply adjust the input fields to reflect the specific requirements and costs associated with each type of project.
Formulas used to calculate an HVAC bid:
Total Labor Cost = Labor Rate per Hour × Estimated Hours
Total Direct Costs = Material Costs + Equipment Costs + Travel Costs + Permit Fees
Indirect Costs = (Total Direct Costs + Total Labor Cost) × (Markup Percentage/100)
Project Cost = Total Direct Costs + Total Indirect Costs + Total Labor Cost
Example:
Labor Rate per Hour = $50
Estimated Hours = 100 hours
Material Costs = $2,000
Equipment Costs = $500
Travel Costs = $200
Permit Fees = $100
Markup Percentage = 15%
Calculator total labor cost:
Total Labor Cost = $50 × 100 = $5,000
Calculate total direct costs:
Total Direct Costs = $2,000 + $500 + $200 + $100 = $2,800
Calculate total indirect costs:
Total Indirect Costs = ($2,800 + $5,000) × (15/100) = $1,170
Calculate total project cost:
Total Project Cost = $2,800 + $1,170 + $5,000 = $8,970
This example demonstrates how the calculator aggregates various costs and applies a markup to provide a comprehensive project bid.